190 open solicitations
Linked solicitations
- Reconstruct Automated Weather Observation System IIIopen03A-VE060ILDue Sep 18, 2026
- Removing and installing new mast arms, foundations, and street signs in three intersections: I-80 EB Exit Ramp at IL 251, I-80 WB Exit Ramp at IL 251, and May Ropen101-66T15ILDue Sep 18, 2026
- Tree removal along the east side of I-57 from 3 miles south of the West Frankfort interchange (at mile marker 62) to 3 miles south of the West City interchange open099-78C34ILDue Sep 18, 2026
- Replace Airfield Signage, Wind Cones, Runway 15 and 27 REILs, and Airport Rotating Beacon; Construct Runway Guard Lights at Runway 15/33open02A-AU075ILDue Sep 18, 2026
- Rehabilitate Airfield Lighting Vault and Replace Vault Generatoropen01A-AU074ILDue Sep 18, 2026
- On-call maintenance of electrical facilities along State Maintained Routes in the western half of District 2.open039-64V86ILDue Sep 18, 2026
- This project is located on FAI 57 (I-57) at IL-17 interchange in Kankakee. Work consists of reconstructing the interchange to provide a single point urban diamoopen001-66863ILDue Sep 18, 2026
- 0.31 miles of reconstruction of Mill Road from US 20 to 0.2 miles north of US 20 and construction of Service Rd 0.3 miles west of Mill Road. The project also coopen033-64V52ILDue Sep 18, 2026
- Replace box culvert (SN 028-7068) on IL 149 over the Green River.open089-78990ILDue Sep 18, 2026
- Superstructure replacement and bridge widening of 2 structures on I-57 over IC Railroad and TR 86 at Jones Switch. (SN 015-0003 and 015-0004)open069-74650ILDue Sep 18, 2026
- Bridge repairs and joint replacement of 10 bridges in Henry County.open034-64T43ILDue Sep 18, 2026
- On-call maintenance of electrical facilities along state maintained routes in the eastern half of District 2.open038-64V85ILDue Sep 18, 2026
- 0.57 miles of pavmement patching and 770' of Standard overlay on IL 251 from 0.3 miles south of IL 38 to 5th Ave in Ogle County.open037-64V24ILDue Sep 18, 2026
- HMA resurfacing on George Street from North Avenue (IL 64 to the north village limit of Melrose Park. Includes curb and gutter, sidewalk, water main installatioopen028-61M63ILDue Sep 18, 2026
- Pedestrian signing and pavement markings to upgrade existing shared-use paths and bicycle routes at various locations in Glenview.open030-61M66ILDue Sep 18, 2026
- HMA resurfacing on Gilbert Avenue from 47th Street to Ogden Avenue in Western Springs. Includes patching, curb and gutter, sidewalks with ADA ramps, drainage imopen029-61M64ILDue Sep 18, 2026
- Replace the bridge carrying Royce Road over the DuPage River, west of IL 53 in Bolingbrook.open027-61M61ILDue Sep 18, 2026
- Construction of a two-span IL-Beam bridge with concrete deck to carry Johnson Road over Nippersink Creek. Includes raising roadway profile, HMA roadway construcopen022-61L85ILDue Sep 18, 2026
- HMA resurfacing and widening at the intersection of Waukegan Rd. and East Lake Avenue in the village of Glenview. Additional work includes storm sewers, curb anopen021-61K82ILDue Sep 18, 2026
- The work to be completed under this contract consists of impact attenuators removal and replacement, sand modules replacement located on various state maintaineopen019-80D23ILDue Sep 18, 2026
- (2.46-Mile) Crack and Joint Sealant improvement consisting of routing, cleaning and sealing of longitudinal cracks and joints within the hot-mix asphalt pavemenopen015-80D39ILDue Sep 18, 2026
- Full-Depth reclamation, HMA binder and surface, aggregate shoulder, and the construction of a shared-use path from Airport Road to IL 23 in Harvard.open026-61M59ILDue Sep 18, 2026
- New Guardrail project and repair of damaged guardrail, removing damaged guardrail components and replacing all removed guardrail components with new material alopen018-80F22ILDue Sep 18, 2026
- (3.44-Mile) SMART Overlay, bridge latex overlay, and ADA improvement includes (HMA) removal, pavement patching, resurfacing with (HMA), drainage structure adjusopen014-80D33ILDue Sep 18, 2026
- SMART Overlay up to the omission and Designed Overlay includes pavement patches hot-mix asphalt (HMA) surface removal, resurfacing with HMA binder and surface copen012-80C95ILDue Sep 18, 2026
- (1.33-Mile) Drainage Improvements of the Frontage Road Storm Sewers (FRS) in Harrison Street that include Open Cut Trenching and Jacking Sewer Installation for open006-62X09ILDue Sep 18, 2026
- (2.28-Mile) Standard Overlay project includes hot-mix asphalt removal, PCC removal, pavement patching, PCC milling, resurfacing with hot-mix asphalt, drainage sopen009-62X84ILDue Sep 18, 2026
- (2.89-Mile) This project consists of Standard and Design Overlay and ADA Improvements and all incidental and collateral work. The project is in the Village of Gopen005-62W73ILDue Sep 18, 2026
- 0.32 miles of pavement patching along IL 2 at the Bauer Pkwy intersection.open040-64W06ILDue Sep 18, 2026
- 0.87 miles of intermittent resurfacing from 5th St to US 30 in Whiteside County.open036-64U88ILDue Sep 18, 2026
- Beam fabrication for proposed SN 081-0174 carrying IL 5 over 27th St in Moline.open041-64W42ILDue Sep 18, 2026
- HMA resurfacing on various routes in Aurora. Includes recessed pavement markings, sidewalk, curb and gutter.open031-61M67ILDue Sep 18, 2026
- HMA resurfacing n Douglas Avenue/Douglas Road from US 30 to Ashland Avenue in Montgomery. Includes curb and gutter, sidewalk, drainage improvements, and detectoopen032-61M68ILDue Sep 18, 2026
- IL 23 deck replacement (SN 050-0047) at Covel Creek 3.4 miles south of IL 71 and bridge replacement (SN 050-0048) at Covel Creek 5.0 miles south of IL 71.open042-66926ILDue Sep 18, 2026
- Taffic signal modernization along Indian Tail between Ohio Street and Pennsbury Lane in Aurora.open023-61M10ILDue Sep 18, 2026
- Full depth pavement reconstruction of Willow Rd. from Forestway Dr. to Provident Ave. in the village of Winnetka. Work includes PCC pavement, curb and gutter, sopen024-61M29ILDue Sep 18, 2026
- Reconstruction of Deerfield Rd. from Milwaukee Ave. to Saunders Rd. in the villages of Buffalo Grove, Riverwoods and Deerfield. Work includes full-depth HMA pavopen020-61K62ILDue Sep 18, 2026
- Construction of a shared-use path from Strieby Drive to Fullerton Avenue in the River Grove Forest Protection District. Includes aggregate and HMA, precast concopen025-61M58ILDue Sep 18, 2026
- Full Expressway Cleaning Cycle and Supplemental Sweeping shall consist of the pickup, removal and satisfactory disposal of limbs, sticks, leaves, sand, stones, open016-80D51ILDue Sep 18, 2026
- This project consists of repairing high tension cable median barrier systems this work includes removing and replacing damaged high tension cable barrier systemopen017-80D70ILDue Sep 18, 2026
- This Project consists of removing trees, as well as all incidental and collateral work necessary to complete the project. This project is in several locations topen013-80D08ILDue Sep 18, 2026
- Culvert replacement (SN 038-2517) at stream under IL 1, located 0.3 miles south of US 24.open043-66B81ILDue Sep 18, 2026
- (6.60-Mile) Design Overlay consists of hot-mix asphalt surface removal, pavement patching, resurfacing with hot-mix asphalt binder course and hot-mix asphalt suopen007-62X33ILDue Sep 18, 2026
- (2.93-mile) This project consists of furnishing and installing landscaping including all incidental and ancillary work necessary to complete the project. Traffiopen008-62X38ILDue Sep 18, 2026
- (4.87-Mile) SMART Overlay project includes hot-mix asphalt removal, pavement patching, resurfacing with hot-mix asphalt, placement of pavement markings, installopen003-62V85ILDue Sep 18, 2026
- This Improvement consists of the placement of bridge deck concrete sealer upon the entire top surface of the bridge deck, sidewalks, top of inside vertical faceopen010-62Y03ILDue Sep 18, 2026
- (2.17-Mile) Project consists of HMA overlay, ADA sidewalk and curb ramp improvements, drainage improvements, APS improvements, HMA surface removal and replacemeopen004-62V90ILDue Sep 18, 2026
- Smart Overlay, ADA and APS improvements consist of hot-mix asphalt surface removal, pavement patching, resurfacing with hot-mix asphalt binder and surface coursopen002-62V55ILDue Sep 18, 2026
- Superstructure replacement of various structures on I-57 including SN 038-0003, SN 038-0004, SN 038-0005, SN 038-0006, SN 038-0009 and SN 038-0010. The project open046-66M80ILDue Sep 18, 2026
- HMA surface removal, HMA overlay and shoulders on CH 17 from Will County line to E 9000 N Road.open047-87918ILDue Sep 18, 2026