il_dot_wctb009-62X84
Open
009-62X84
- Response deadline
- Sep 18, 2026 Due in 33 days
- Date posted
- Aug 10, 2026
- Source
- Open notice
Description
(2.28-Mile) Standard Overlay project includes hot-mix asphalt removal, PCC removal, pavement patching, PCC milling, resurfacing with hot-mix asphalt, drainage structure adjustment and cleaning, placement of pavement markings, installation of raised reflective markers, ADA ramps, pedestrian signals, detector loops. Location is on Pershing Road and is a four-lane minor arterial located in the villages of Lyons and Stickney, Cook County.
Documents (2)
- 009-62X84-plans.htmltext/html; charset=UTF-8470 BNot yet available
- 009-62X84-pay-items.csvtext/csv8 KBNot yet available
Contacts
- dot.de-contracts@illinois.gov(217) 782-7806