il_dot_wctb014-80D33
Open
014-80D33
- Response deadline
- Sep 18, 2026 Due in 33 days
- Date posted
- Aug 10, 2026
- Source
- Open notice
Description
(3.44-Mile) SMART Overlay, bridge latex overlay, and ADA improvement includes (HMA) removal, pavement patching, resurfacing with (HMA), drainage structure adjustment and cleaning, pavement markings, raised reflective markers, ADA ramps, sidewalk replacement, curb and gutter replacement, pedestrian signals, detector loops, hydro-scarification, deck slab repair, diamond grinding, joint replacement with strip seals, replace diaphragms, approach slab repair, concrete sealer, asphalt butt joints, relief joint cleaning sealing, stream gauge. Location is in the City of Harvey and the Village of Dolton, South Holland and Dixmoor in Cook County.
Documents (1)
- 014-80D33-pay-items.csvtext/csv13 KBNot yet available
Contacts
- dot.de-contracts@illinois.gov(217) 782-7806