il_dot_wctb012-80C95
Open
012-80C95
- Response deadline
- Sep 18, 2026 Due in 33 days
- Date posted
- Aug 10, 2026
- Source
- Open notice
Description
SMART Overlay up to the omission and Designed Overlay includes pavement patches hot-mix asphalt (HMA) surface removal, resurfacing with HMA binder and surface course, longitudinal joint sealing, curb and gutter removal and replacement, drainage structures adjustments and cleaning, new thermoplastic pavement markings, detector loops replacement, curb ramps for sidewalk (ADA) improvement installation of raised reflective pavement markers, and minor traffic signal improvements (installation of accessible pedestrian signals - APS). The project is located within the City of Braidwood.
Documents (1)
- 012-80C95-pay-items.csvtext/csv9 KBNot yet available
Contacts
- dot.de-contracts@illinois.gov(217) 782-7806