il_dot_wctb010-62Y03
Open
010-62Y03
- Response deadline
- Sep 18, 2026 Due in 33 days
- Date posted
- Aug 10, 2026
- Source
- Open notice
Description
This Improvement consists of the placement of bridge deck concrete sealer upon the entire top surface of the bridge deck, sidewalks, top of inside vertical faces of the parapets, face of curbs and inside and outside of dividing walls along walkways of the structure, both faces of parapet where parapet separates roadway from sidewalk. These improvements are located on various routes/ structures within the Lake County limits.
Documents (1)
- 010-62Y03-pay-items.csvtext/csv2 KBNot yet available
Contacts
- dot.de-contracts@illinois.gov(217) 782-7806