Installation of Heated Auxiliary Drain Cabinets and Dry Valves and OS&Y valves
- Response deadline
- Jul 3, 2026 Closed
- Date posted
- Jun 22, 2026
- Source
- Open notice
Description
Furnish and install heated auxiliary drain cabinets, Model AGF5450H AUX DRN H CAB with heater and alarm (galvanized).Furnish and install SP-AGF5680A auxiliary drain exterior cover (Model 5680AFurnish and install SP-AGF5690A back plate mounting assemblyFurnish and install brass quarter-turn ball valves with chrome-plated balls installed above each drain cabinet.Furnish and install 6-inch dry pipe valves, Tyco DPV-1, flange x grooved, complete with trim package, accelerators, and Victaulic couplingsFurnish and install 4-inch dry pipe valve, Tyco DPV-1, flange x grooved, complete with trim package, accelerator, and Victaulic couplingsFurnish and install 6-inch OS&Y Mueller valves (Outside Screw and Yoke) control valves for the fire sprinkler systemFurnish and install 4-inch OS&Y Mueller valve (Outside Screw and Yoke) control valveFurnish and install all the required signageFurnish and install 1¼-inch swing check valve for the dry system drain in the tunnel areaFurnish and install 2-inch ball valve for the dry system drain in the tipping floor areaFurnish and install all required installation materialsTesting, commissioning, fire marshal final inspection, and all related final inspections
Classifications
- NAICS8297
Documents
No documents posted for this opportunity.
Contacts
- Seimin Azeimi