Civic AI
Civic AI
Procurement intelligence
va_eva127293
Open

Auxiliary Drains at I-66 Landfill

Response deadline
Sep 8, 2026
Due in 12 days
Date posted
Aug 27, 2026

Description

The Contractor shall provide all labor, supervision, materials, new equipment, permits, inspections, and technical expertisenecessary to remove existing components, including electrical connections where required, and furnish and install new fireprotection equipment. Contractor shall field verify all dimensions, existing conditions, piping arrangements, equipment locations,and system configurations prior to installation. The scope of work includes, but is not limited to, the items described herein. TheContractor shall deliver a complete and fully operational system, including all materials, fittings, couplings, supports, hangers, trim,and accessories required for a complete installation, whether specifically listed or not.

Classifications

Documents

No documents posted for this opportunity.

Contacts

Similar contracts

Explore more