Scaffolding and Insulation Services at Lakeland Electric Power Generation Facilities
- Response deadline
- Aug 21, 2026 Closed
- Date posted
- Jul 24, 2026
- Source
- Open notice
Description
Lakeland Electric seeks proposals from qualified contractors to provide scaffolding, mechanical insulation installation, repair, maintenance, and removal services at Lakeland Electric power generation facilities,or other applicable use to the City of Lakeland . Services shall be performed on an as-needed basis in support of routine maintenance, forced outages, planned outages, capital projects, inspections, and emergency response activities. Facilities may include, but are not limited to: McIntosh Power Plant Larsen Power Plant Winston Peaking Station Other Lakeland Electric facilities as designated by OWNER THIS RFP SHALL RESULT IN A ONE (1) YEAR CONTRACT WITH AN OPTION FOR FOUR (4), ONE (1) YEAR RENEWALS UPON MUTUAL CONSENT.
Documents
No documents posted for this opportunity.
Similar contracts
- Annual Rotating Equipment Inspection, Testing, Repair, Reconditioning and Storage ServicesFLDue Nov 6, 2026
- McIntosh Power Plant - Heat Trace Bundle Material and AccessoriesFLDue Oct 13, 2026
- McIntosh Unit 5 – 60-Inch Circulating Water Motor Operated Valve ReplacementFLDue Oct 29, 2026
- McIntosh Power Plant Cooling Tower Distribution System ReplacementFLDue Oct 14, 2026
- Annual Maintenance, Repair, and Inspection Services for Mobile Medium-Heavy EquipmentFLDue Oct 9, 2026
- Lakeland Electric - Unit 5 - 2026 Fall Outage Contract ServicesFLDue Oct 2, 2026