McIntosh Power Plant Cooling Tower Distribution System Replacement
- Response deadline
- Oct 14, 2026 Due in 25 days
- Date posted
- Sep 18, 2026
- Source
- Open notice
Description
The City of Lakeland, Lakeland Electric (OWNER), is seeking qualified contractors to provide all labor, supervision, materials, equipment, and services necessary for the replacement of the existing cooling water distribution system at McIntosh Power Plant. The work generally consists of removing the existing header piping, lateral piping, and spray nozzles and furnishing and installing a complete new distribution system. The work will be performed during the Spring 2027 (April 30-May 17) scheduled outage. The Contractor will be required to coordinate closely with Lakeland Electric and complete the work within the established cooling tower availability window to support scheduled unit startup activities.
Documents
No documents posted for this opportunity.
Similar contracts
- Annual Maintenance, Repair, and Inspection Services for Mobile Medium-Heavy EquipmentFLDue Oct 9, 2026
- Lakeland Electric - Unit 5 - 2026 Fall Outage Contract ServicesFLDue Oct 2, 2026
- McIntosh Power Plant Unit 5 Turbine Lube Oil ReplacementFLDue Sep 9, 2026
- Annual Agreement for Non-Destructive Examination Services (NDE)FLDue Aug 28, 2026
- Annual Heat Recovery Steam Generator Cleaning ServicesFLDue Aug 28, 2026
- Scaffolding and Insulation Services at Lakeland Electric Power Generation FacilitiesFLDue Aug 21, 2026