Town of Suffield - New Sidewalk along Mapleton Avenue
- Response deadline
- Sep 8, 2026 Due in 28 days
- Date posted
- Aug 11, 2026
- Source
- Open notice
Description
The project involves the construction of approximately 2,200 feet of concrete sidewalks along with drainage improvements and two retaining walls. Sidewalk construction includes: driveway paving as required for areas disturbed by work. Drainage work includes: installation of one catch basin, 1 pipe end and 50 feet of storm drain pipe. Retaining wall includes an approximately 150 feet long by 2.5 feet high retaining wall with a chain link fence within the right of way and removal and replacement of a retaining wall for a driveway turnaround on property of 400 Mapleton Avenue.
Classifications
- NAICS72000000
Documents (2)
- Mapleton Ave Sidewalk Bid Documents Final 8-11-2026.pdfapplication/pdf2.9 MBNot yet available
- Mapleton Ave Sidewalks Plans Final.pdfapplication/pdf2.7 MBNot yet available
Contacts
- bhawkins@suffieldct.gov860-668-3848
Similar contracts
- Spot Improvements on River Street (Route 313) in the Town of SeymourCTDue Sep 16, 2026
- Statewide Septic ServicesCTDue Aug 29, 2026
- MPA 331 FY27 Locksmith ServicesRIDue Sep 9, 2026
- Replace 3 Bridges State & Local Roads over I -91CTDue Sep 9, 2026
- Project L-617 Transmission Tubular Steel StructuresCTDue Aug 26, 2026
- 2027-06 Professional Design Services for the Weed Beach Bathhouse DeckCTDue Sep 10, 2026