ct_source38447
Open
Town of Suffield - New Sidewalk along Mapleton Avenue
- Response deadline
- Sep 8, 2026 Closed
- Date posted
- Aug 11, 2026
- Source
- Open notice
Description
The project involves the construction of approximately 2,200 feet of concrete sidewalks along with drainage improvements and two retaining walls. Sidewalk construction includes: driveway paving as required for areas disturbed by work. Drainage work includes: installation of one catch basin, 1 pipe end and 50 feet of storm drain pipe. Retaining wall includes an approximately 150 feet long by 2.5 feet high retaining wall with a chain link fence within the right of way and removal and replacement of a retaining wall for a driveway turnaround on property of 400 Mapleton Avenue.
Classifications
- NAICS72000000
Documents (2)
- Mapleton Ave Sidewalk Bid Documents Final 8-11-2026.pdfapplication/pdf2.9 MBNot yet available
- Mapleton Ave Sidewalks Plans Final.pdfapplication/pdf2.7 MBNot yet available
Contacts
- bhawkins@suffieldct.gov860-668-3848
Similar contracts
- Nbha 2026-09-IpmCTDue Oct 21, 2026
- Professional Consulting and Inspection Services for DEEPCTDue Oct 26, 2026
- Safety Improvements at Portland Ave & Depot Rd Railroad Crossing in RidgefieldCTDue Oct 21, 2026
- Painting ProjectsCTDue Oct 14, 2026
- RFP Design-Build Services-Fire Station Renovations, Foxon and HQ StationsCTDue Sep 25, 2026
- Annual Prequalification Program for General ContractorsCTDue Oct 13, 2026