(RE-BID) Meridian Play Area Renovation and ADA Meridian RR Design
- Response deadline
- Sep 2, 2026 Due in 20 days
- Date posted
- Aug 12, 2026
- Source
- Open notice
Description
Project Description: This project will replace the play area, located in Meridian Park. Renovation includes new play equipment, accessible access to all; site furniture, landscape and updated accessible restroom. This project includes two alternates: Alternate. 1 - Sidewalk paving and replacement in lieu of repair. Sidewalk extends from new. Accessible connection to northeast corner of Good Shepherd center will be demolished and installed as new sidewalk, rather than repaired. Alternate. 2 - EWF in combination with PIP Surfacing. A portion of the EWF Play surfacing will be replaced with Poured-in-Place surfacing and cast in place concrete slab underlay. Engineer's Estimate: $940,347.00; Alternate#1: $82,250.00. Alternate#2: $392,728.00. Project Location: 4920 MERIDIAN AVE N, SEATTLE, WA 98103.
Documents
No documents posted for this opportunity.
Similar contracts
- FS 31 Interim DecommissioningWADue Sep 16, 2026
- Central West Headquarters Electrical Service RelocationWADue Sep 2, 2026
- Central West Headquarters Re-RoofWADue Aug 19, 2026
- REBID Seattle City Hall Plaza Waterproofing ReplacementWADue Sep 2, 2026
- 4th Ave S Over ARGO Bridge RepairWADue Aug 5, 2026
- Water Main Rehab Package 6 - NorthWADue Aug 5, 2026