(RE-BID) Meridian Play Area Renovation and ADA Meridian RR Design
- Response deadline
- Sep 2, 2026 Closed
- Date posted
- Aug 12, 2026
- Source
- Open notice
Description
Project Description: This project will replace the play area, located in Meridian Park. Renovation includes new play equipment, accessible access to all; site furniture, landscape and updated accessible restroom. This project includes two alternates: Alternate. 1 - Sidewalk paving and replacement in lieu of repair. Sidewalk extends from new. Accessible connection to northeast corner of Good Shepherd center will be demolished and installed as new sidewalk, rather than repaired. Alternate. 2 - EWF in combination with PIP Surfacing. A portion of the EWF Play surfacing will be replaced with Poured-in-Place surfacing and cast in place concrete slab underlay. Engineer's Estimate: $940,347.00; Alternate#1: $82,250.00. Alternate#2: $392,728.00. Project Location: 4920 MERIDIAN AVE N, SEATTLE, WA 98103.
Documents
No documents posted for this opportunity.
Similar contracts
- Priority Curb RampsWADue Oct 14, 2026
- Garfield Superblock Renovation- Softball FieldWADue Oct 7, 2026
- Seattle City Hall (SCH) Roof and Windows ReplacementWADue Sep 23, 2026
- Lower Woodland #4 and Fairmount Playground Infield ConversionWADue Sep 16, 2026
- SS4A Package 1: STM ScopeWADue Sep 16, 2026
- Central West Headquarters Electrical Service RelocationWADue Sep 2, 2026