Central West Headquarters Electrical Service Relocation
- Response deadline
- Sep 2, 2026 Due in 20 days
- Date posted
- Aug 12, 2026
- Source
- Open notice
Description
Project Description: Electrical Service Relocation Obtain temporary overhead service from Seattle city light (to allow expedited demolition of existing mast). Demolish existing mast as soon as temporary service is established, Replace existing 240D/120V/3PH/4W/600A service with new. Demolish existing weather head and overhead service. Maintain existing low voltage weather head and service. Install new service mast, weather head, CT, meter, service disconnect and new main distribution panel. Backfeed existing loads from new main distribution board. Provide back-up generator for service shut-down and cut-over in case additional downtime is required. Obtain street use permit from Seattle department of transportation for street crossing. Engineer's Estimate: $221,154.00 Project Location: 1403 W Howe St Seattle WA 98119
Documents
No documents posted for this opportunity.
Similar contracts
- FS 31 Interim DecommissioningWADue Sep 16, 2026
- (RE-BID) Meridian Play Area Renovation and ADA Meridian RR DesignWADue Sep 2, 2026
- Central West Headquarters Re-RoofWADue Aug 19, 2026
- REBID Seattle City Hall Plaza Waterproofing ReplacementWADue Sep 2, 2026
- 4th Ave S Over ARGO Bridge RepairWADue Aug 5, 2026
- Water Main Rehab Package 6 - NorthWADue Aug 5, 2026