Civic AI
Civic AI
Procurement intelligence
OpenGov / IonwavePW#2026-012
Open

Lower Woodland #4 and Fairmount Playground Infield Conversion

Response deadline
Sep 9, 2026
Due in 21 days
Date posted
Aug 19, 2026

Description

Project Description: Both playfield sites are existing unimproved clay/silt infield soil infields, to be converted to synthetic turf surfacing with a supplemental pad underlayment. The work includes excavation, stormwater utilities, subsurface drainage, import bulk aggregates, minor irrigation systems reconfiguration, and site restoration. The Fairmount site includes a stormwater treatment vault. Lower Woodland 4 includes a side-sewer connection. Engineer's Estimate: $1,198,227.00 Project Location: Lower Woodland #4: 1000 N 50th St Seattle, WA 98103 and Fairmount Playground Infield Conversion: 5400 Fauntleroy Way SW Seattle, WA 98103

Documents

No documents posted for this opportunity.

Similar contracts

Explore more