Project Description: Both playfield sites are existing unimproved clay/silt infield soil infields, to be converted to synthetic turf surfacing with a supplemental pad underlayment. The work includes excavation, stormwater utilities, subsurface drainage, import bulk aggregates, minor irrigation systems reconfiguration, and site restoration. The Fairmount site includes a stormwater treatment vault. Lower Woodland 4 includes a side-sewer connection. Engineer's Estimate: $1,198,227.00 Project Location: Lower Woodland #4: 1000 N 50th St Seattle, WA 98103 and Fairmount Playground Infield Conversion: 5400 Fauntleroy Way SW Seattle, WA 98103
Documents
No documents posted for this opportunity.
Similar contracts
- Central West Headquarters Electrical Service RelocationWADue Sep 2, 2026
- FS 31 Interim DecommissioningWADue Sep 16, 2026
- (RE-BID) Meridian Play Area Renovation and ADA Meridian RR DesignWADue Sep 2, 2026
- Central West Headquarters Re-RoofWADue Aug 26, 2026
- REBID Seattle City Hall Plaza Waterproofing ReplacementWADue Sep 2, 2026
- 4th Ave S Over ARGO Bridge RepairWADue Aug 5, 2026