Frisco Campus Chilled and Heating Water Loop Extension
- Response deadline
- Jul 28, 2026 Due in 10 days
- Date posted
- Jun 22, 2026
- Source
- Open notice
Description
Collin College is seeking qualified proposals for the Frisco Campus Chilled and Heating Water Loop Extension. Pending approval by the Board of Trustees, work must be completed during the course of Fiscal Year 2027. Extreme coordination between the College and the selected contractor will be required to ensure there is no disruption to campus heating or cooling needs. A requirement of this project is that the campus remains operational during normal business hours; therefore, any planned temporary shutdowns must occur outside of normal business hours. Shutdowns must be coordinated with the college at least two weeks in advance. Excavation will occur in various locations throughout the campus. The contractor shall bear the cost and burden of returning the site to its original condition, or better. The College will not be responsible for any underground utility damages or property damages. The contractor should perform their due diligence to identify all underground utilities or obstructions. The contractor is expected to proactively identify and propose value engineering opportunities. The contractor shall include cost for double shifts and/or 7 day work weeks during the project , including specifically designated shut-down windows, if needed, to complete project on time. A project schedule must be submitted with each proposal. The contractor must identify and inform the College of all long lead items (10 weeks+).
Documents
No documents posted for this opportunity.