ionwave2026-10 Addendum 3 (UMC MLK Warehouse Remodel)
Open
UMC MLK Warehouse Remodel
- Response deadline
- Sep 18, 2026 Closed
- Date posted
- Aug 21, 2026
- Source
- Open notice
Description
PWP-CL-2026-501 SCOPE OF WORK SUMMARY: This work will primarily take place within the building located at 300 S M.L.K. Blvd, Las Vegas, NV 89106. The building is approximately 35,309 square feet. As part of the work, finishes will be refreshed for office space use, and a warehouse area will be prepared to conform to architectural drawings. Renovation work will include, but not be limited to, demolition of flooring. Upgrades are to be made to the existing light fixtures. New electrical and data access points are to be installed to accommodate planned workstations.
Documents (17)
- Public Question & AnswerNot yet available
- Bid InvitationNot yet available
- BID ATTACHMENT 1 - AUTHORITY TO SUBMIT BID.pdfNot yet available
- ADDENDUM 3 - BID ATTACHMENT 7 - SCHEDULE OF VALUES.pdfNot yet available
- ADDENDUM 3 - 2026-10 - UMC MLK Warehouse Remodel - Instructions.pdfNot yet available
- BID ATTACHMENT 5 - 5% DESIGNATION OF SUBCONTRACTORS.pdfNot yet available
- ADDENDUM 3 - Reference Material - Exterior Paint.pdfNot yet available
- ADDENDUM 2 - 2026-10 UMC MLK Warehouse - Sign-In Sheet w Signatures 083126.pdfNot yet available
- ADDENDUM 3 - Reference Material - UMC Sign Design.pdfNot yet available
- ADDENDUM 1 - Reference Material - Architectural - Rev2-FullSet rev1.pdfNot yet available
- ADDENDUM 3 - BID ATTACHMENT 2 - BID FORM.pdfNot yet available
- ADDENDUM 3 - Exhibit A - Scope of Work.pdfNot yet available
- BID ATTACHMENT 4 - 1% DESIGNATION OF SUBCONTRACTORS.pdfNot yet available
- BID ATTACHMENT 3 - BID BOND.pdfNot yet available
- ADDENDUM 1 - Reference Material - Architectural - Drawing Index rev1.pdfNot yet available
- ADDENDUM 3 - Reference Material - Edge-Mount-LEVELERS4.pdfNot yet available
- ADDENDUM 3 - Reference Material - Floor Plan Doors.pdfNot yet available
Contacts
- fred.parandi@umcsn.com(702) 383-2346
Similar contracts
- UMC MLK Warehouse RemodelNVDue Sep 18, 2026
- UMC Outpatient Pharmacy (1800 W Charleston) RemodelNVDue Sep 2, 2026
- UMC Outpatient Pharmacy (1800 W Charleston) RemodelNVDue Sep 2, 2026
- UMC Outpatient Pharmacy (1800 W Charleston) RemodelNVDue Sep 2, 2026
- UMC 7 Story Tower 6th Floor PT RemodelNVDue Jul 10, 2026
- UMC Summit Tower Floors 2 & 6 RemodelNVDue Jul 24, 2026