nc_evp121-090126JVC
Open
The scope of work includes renovation of existing CBTC Annex building and includes the division of an existing classroom into a smaller classroom and a new office with windows out to the garage. he…
- Response deadline
- Sep 29, 2026 Closed
- Date posted
- Sep 1, 2026
- Source
- Open notice
Description
The scope of work includes renovation of existing CBTC Annex building and includes the division of an existing classroom into a smaller classroom and a new office with windows out to the garage. he scope also includes the replacement of two (2) garage doors, a new garage door in a new opening, a new covered and secure outdoor storage area, new exhaust reels and compressed air hoses for two (2) new vehicle lifts. Additional work includes painting, electrical upgrades, lighting upgrades, an EV Charger, a new air compressor with additional piping, improved ventilation systems, and three (3) new HVLS fans.
Documents (2)
- 121-090126JVC.pdfapplication/pdf166 KBNot yet available
- Addendum_1_09.02.26.pdfapplication/pdf115 KBNot yet available
Contacts
Similar contracts
- This request for proposals is for commissioning services for the design and construction of the $25,000,000 Automotive Building at Rowan-Cabarrus Community College’s (RCCC) North Campus in Salisbur…NCDue Nov 12, 2026
- REPOST -The work consists of furnishing all labor, materials, equipment, and services necessary for the construction of the project: The existing HVAC equipment, as indicated in project documents, …NCDue Sep 29, 2026
- This request for qualifications is for Construction Manager at Risk (CMR) Pre-construction services for the $25,000,000 Automotive Building at Rowan-Cabarrus Community College’s (RCCC) North Campus…NCDue Oct 13, 2026
- This Request for Qualifications (RFQ) is for Design-Build Services associated with the planning, design, permitting, and construction of the Rowan-Cabarrus Community College Fire Training Center, P…NCDue Sep 1, 2026
- Partial demolition and replacement of existing ceiling tiles and grids per marked-up plans provided, verification/corrections as needed for existing above ceiling infrastructure and independent str…NCDue Aug 27, 2026
- The existing HVAC equipment, as indicated in project documents, is at the end of its statistical life expectancy and has become maintenance intensive. This project will replace two aging chillers …NCDue Sep 10, 2026