nc_evp121-071426JA
Open
The existing HVAC equipment, as indicated in project documents, is at the end of its statistical life expectancy and has become maintenance intensive. This project will replace two aging chillers …
- Response deadline
- Sep 10, 2026 Due in 8 days
- Date posted
- Jul 14, 2026
- Source
- Open notice
Description
The existing HVAC equipment, as indicated in project documents, is at the end of its statistical life expectancy and has become maintenance intensive. This project will replace two aging chillers (31 and 24 years), which serve the entire campus, with a modular chiller solution to minimize general construction impact. The project will also replace both the S201 and adjacent S202 building air handling units that are original to the buildings and beyond anticipated life. Replace remaining pneumatic controls, which are no longer well supported, will be replaced with direct digital controls. The Building Automation System software will also be upgraded to the College standard to enhance operation of the system.
Documents (5)
- 121-071426JA.pdfapplication/pdf132 KBNot yet available
- Addendum-4_08.17.26.pdfapplication/pdf84 KBNot yet available
- Transmittal - 00020.pdfapplication/pdf107 KBNot yet available
- Addendum_3_08.11.26.pdfapplication/pdf2.4 MBNot yet available
- RCCC S201 HVAC Upgrades Addendum 1.pdfapplication/pdf1.5 MBNot yet available
Contacts
Similar contracts
- The scope of work includes renovation of existing CBTC Annex building and includes the division of an existing classroom into a smaller classroom and a new office with windows out to the garage. he…NCDue Sep 29, 2026
- This Request for Qualifications (RFQ) is for Design-Build Services associated with the planning, design, permitting, and construction of the Rowan-Cabarrus Community College Fire Training Center, P…NCDue Sep 1, 2026
- Partial demolition and replacement of existing ceiling tiles and grids per marked-up plans provided, verification/corrections as needed for existing above ceiling infrastructure and independent str…NCDue Aug 27, 2026
- Expansion / Renovation of existing 11,995 sq ft building and addition/ replacement of some mechanical equipment, additional Scope of Work details provided in documentNCDue Aug 20, 2026
- Commissioning Agent (Cx) and Retro-Commissioning Agent (RCx) and related services that are to be provided as per the Rowan-Cabarrus Community College Scope of Services/Work for Commissioning Agent …NCDue Jul 14, 2026
- Electrical engineering design services that are to be provided on a routine or as needed basis for small, miscellaneous projects under $300,000. Annual fees may not exceed $150,000 in total value …NCDue Jul 9, 2026