REPOST -The work consists of furnishing all labor, materials, equipment, and services necessary for the construction of the project: The existing HVAC equipment, as indicated in project documents, …
- Response deadline
- Sep 29, 2026 Closed
- Date posted
- Sep 17, 2026
- Source
- Open notice
Description
REPOST -The work consists of furnishing all labor, materials, equipment, and services necessary for the construction of the project: The existing HVAC equipment, as indicated in project documents, is at the end of its statistical life expectancy and has become maintenance intensive. This project will replace two aging chillers (31 and 24 years), which serve the entire campus, with a modular chiller solution to minimize general construction impact. The project will also replace both the S201 and adjacent S202 building air handling units that are original to the buildings and beyond anticipated life. Replace remaining pneumatic controls, which are no longer well supported, will be replaced with direct digital controls. The Building Automation System software will also be upgraded to the College standard to enhance operation of the system.
Documents (1)
- 121-091726JA.pdfapplication/pdf5.7 MBNot yet available
Contacts
Similar contracts
- This request for proposals is for commissioning services for the design and construction of the $25,000,000 Automotive Building at Rowan-Cabarrus Community College’s (RCCC) North Campus in Salisbur…NCDue Nov 12, 2026
- This request for qualifications is for Construction Manager at Risk (CMR) Pre-construction services for the $25,000,000 Automotive Building at Rowan-Cabarrus Community College’s (RCCC) North Campus…NCDue Oct 13, 2026
- The scope of work includes renovation of existing CBTC Annex building and includes the division of an existing classroom into a smaller classroom and a new office with windows out to the garage. he…NCDue Sep 29, 2026
- This Request for Qualifications (RFQ) is for Design-Build Services associated with the planning, design, permitting, and construction of the Rowan-Cabarrus Community College Fire Training Center, P…NCDue Sep 1, 2026
- Partial demolition and replacement of existing ceiling tiles and grids per marked-up plans provided, verification/corrections as needed for existing above ceiling infrastructure and independent str…NCDue Aug 27, 2026
- The existing HVAC equipment, as indicated in project documents, is at the end of its statistical life expectancy and has become maintenance intensive. This project will replace two aging chillers …NCDue Sep 10, 2026