The scope of this project will include full design and construction administration services for the modernization of the two passenger elevators in Building HA on the Perry Health Sciences Campus. …
- Response deadline
- Jun 30, 2026 Closed
- Date posted
- Jun 4, 2026
- Source
- Open notice
Description
The scope of this project will include full design and construction administration services for the modernization of the two passenger elevators in Building HA on the Perry Health Sciences Campus. One elevator has 5 stops and one elevator has 6 stops. The existing elevators are gearless traction type elevators installed in 2012 with a current history of frequent repairs over the last few years. The modernization scope will include the evaluation for replacement of and/or upgrades to the Elevator Equipment Room, Hoistway (including the gearless hoist machines), Elevator Cars and Elevator Lobbies. In order to fully develop the final scope of work, an existing conditions analysis for the above scope of work will be required on a cost benefit basis.
Documents (2)
Contacts
Similar contracts
- Renovation of two existing buildings on the RTP campus to incorporate the Biotech Capstone RTP. Renovation to include the existing clean room to accommodate a real-world aseptic lab as well as a pl…NCDue Oct 5, 2026
- Design Consulting Services - Renovations to Building L Student Services - 105,669 sf 3-story building housing general student services, advising, classrooms, culinary training, student lounge w/ fo…NCDue Sep 11, 2026
- Renovation of two existing buildings on the RTP campus to incorporate the Biotech Capstone RTP. Renovation to include the existing clean room to accommodate a real-world aseptic lab as well as a pl…NCDue Aug 31, 2026
- Construction Materials Testing and Special Inspection services for Conlon Western Wake Phase 1 in Apex, NC. Included in Phase 1 will be site development, infrastructure installation, and the constr…NCDue Jul 29, 2026
- Professional Commissioning Agent (CxA) services for construction commissioning for the replacement of outdoor air-cooled chillers at the Southern Wake Campus (3 locations) and the Perry Health Scie…NCDue Jun 30, 2026