Civic AI
Civic AI
Procurement intelligence
nc_evp1006Bid # 130-WTCC9223C
Open

The scope of this project will include full design and construction administration services for the modernization of the two passenger elevators in Building HA on the Perry Health Sciences Campus. …

WAKE TECHNICAL COMMUNITY COLLEGE - CONSTRUCTION / Project 2795 Conlon Western Wake- Phase 1 · NC
Response deadline
Jun 30, 2026
Closed
Date posted
Jun 4, 2026

Description

The scope of this project will include full design and construction administration services for the modernization of the two passenger elevators in Building HA on the Perry Health Sciences Campus. One elevator has 5 stops and one elevator has 6 stops. The existing elevators are gearless traction type elevators installed in 2012 with a current history of frequent repairs over the last few years. The modernization scope will include the evaluation for replacement of and/or upgrades to the Elevator Equipment Room, Hoistway (including the gearless hoist machines), Elevator Cars and Elevator Lobbies. In order to fully develop the final scope of work, an existing conditions analysis for the above scope of work will be required on a cost benefit basis.

Documents (2)

  • RFQ for Designer - HA Elevator_final 130-WTCC9223C.pdf
    application/pdf193 KB
    Download
  • eVP RFQ Ad for Designer Bldg HA Elevator 130-WTCC9223C.pdf
    application/pdf165 KB
    Download

Contacts

  • Deborah Hutchins

Explore more