nc_evp1006Bid #130-WTCC9225C
Open
Construction Materials Testing and Special Inspection services for Conlon Western Wake Phase 1 in Apex, NC. Included in Phase 1 will be site development, infrastructure installation, and the constr…
WAKE TECHNICAL COMMUNITY COLLEGE - CONSTRUCTION / Project 3050 RTP Campus – RTP Campus Renovations · NC
- Response deadline
- Jul 29, 2026 Closed
- Date posted
- Jun 25, 2026
- Source
- Open notice
Description
Construction Materials Testing and Special Inspection services for Conlon Western Wake Phase 1 in Apex, NC. Included in Phase 1 will be site development, infrastructure installation, and the construction of one (1) new building (to be named Fujifilm Hall) at approximately 125,000 square feet.
Documents (2)
Contacts
Similar contracts
- Renovation of two existing buildings on the RTP campus to incorporate the Biotech Capstone RTP. Renovation to include the existing clean room to accommodate a real-world aseptic lab as well as a pl…NCDue Oct 5, 2026
- Design Consulting Services - Renovations to Building L Student Services - 105,669 sf 3-story building housing general student services, advising, classrooms, culinary training, student lounge w/ fo…NCDue Sep 11, 2026
- Renovation of two existing buildings on the RTP campus to incorporate the Biotech Capstone RTP. Renovation to include the existing clean room to accommodate a real-world aseptic lab as well as a pl…NCDue Aug 31, 2026
- Professional Commissioning Agent (CxA) services for construction commissioning for the replacement of outdoor air-cooled chillers at the Southern Wake Campus (3 locations) and the Perry Health Scie…NCDue Jun 30, 2026
- The scope of this project will include full design and construction administration services for the modernization of the two passenger elevators in Building HA on the Perry Health Sciences Campus. …NCDue Jun 30, 2026