nc_evp1006Bid # 130-WTCC9229C
Open
Renovation of two existing buildings on the RTP campus to incorporate the Biotech Capstone RTP. Renovation to include the existing clean room to accommodate a real-world aseptic lab as well as a pl…
- Response deadline
- Dec 7, 2026 Due in 27 days
- Date posted
- Nov 10, 2026
- Source
- Open notice
Description
Renovation of two existing buildings on the RTP campus to incorporate the Biotech Capstone RTP. Renovation to include the existing clean room to accommodate a real-world aseptic lab as well as a plant sciences lab for the degree program. There are also other miscellaneous renovations including wood slat ceiling replacement, student services office rework, and science lab upgrades. Site work to include a new surface lot for industry parking and a greenhouse.
Documents (2)
- 130-WTCC9229C 3050 Wake Tech eVP RFQ Ad for CMAR_RTP Renos.pdfapplication/pdf170 KBNot yet available
- 130-WTCC9229C Wake Tech RFQ for CMR_RTP Renovations.pdfapplication/pdf168 KBNot yet available
Contacts
Similar contracts
- Renovation of two existing buildings on the RTP campus to incorporate the Biotech Capstone RTP. Renovation to include the existing clean room to accommodate a real-world aseptic lab as well as a pl…NCDue Oct 5, 2026
- Design Consulting Services - Renovations to Building L Student Services - 105,669 sf 3-story building housing general student services, advising, classrooms, culinary training, student lounge w/ fo…NCDue Sep 11, 2026
- Renovation of two existing buildings on the RTP campus to incorporate the Biotech Capstone RTP. Renovation to include the existing clean room to accommodate a real-world aseptic lab as well as a pl…NCDue Aug 31, 2026
- Construction Materials Testing and Special Inspection services for Conlon Western Wake Phase 1 in Apex, NC. Included in Phase 1 will be site development, infrastructure installation, and the constr…NCDue Jul 29, 2026
- The scope of this project will include full design and construction administration services for the modernization of the two passenger elevators in Building HA on the Perry Health Sciences Campus. …NCDue Jun 30, 2026
- Professional Commissioning Agent (CxA) services for construction commissioning for the replacement of outdoor air-cooled chillers at the Southern Wake Campus (3 locations) and the Perry Health Scie…NCDue Jun 30, 2026