Provide multiple new compressed air drops with new piping to match existing down from the existing ceiling level compressed air system to the new owner provided manufacturing equipment. Provide all…
GASTON COLLEGE / Lena Sue Beam Boiler Addition Project · NC
- Response deadline
- Jul 14, 2026 Closed
- Date posted
- Jun 18, 2026
- Source
- Open notice
Description
Provide multiple new compressed air drops with new piping to match existing down from the existing ceiling level compressed air system to the new owner provided manufacturing equipment. Provide all new appurtenances necessary for a complete and operational system but not limited to, connection types, pressure gauges, moisture trap, pressure regulators, shut off valves, hangers and supports, etc. All new piping shall match the existing Prevost compressed air piping system. Coordinate with manufacturing equipment provider for final connection, sizes, required pressures, etc.