Civic AI
Civic AI
Procurement intelligence
nc_evp98-31280
Open

Provide multiple new compressed air drops with new piping to match existing down from the existing ceiling level compressed air system to the new owner provided manufacturing equipment. Provide all…

GASTON COLLEGE / Lena Sue Beam Boiler Addition Project · NC
Response deadline
Jul 14, 2026
Closed
Date posted
Jun 18, 2026

Description

Provide multiple new compressed air drops with new piping to match existing down from the existing ceiling level compressed air system to the new owner provided manufacturing equipment. Provide all new appurtenances necessary for a complete and operational system but not limited to, connection types, pressure gauges, moisture trap, pressure regulators, shut off valves, hangers and supports, etc. All new piping shall match the existing Prevost compressed air piping system. Coordinate with manufacturing equipment provider for final connection, sizes, required pressures, etc.

Documents (2)

  • MEP_Gaston College FIC Carding Rm Equip.pdf
    application/pdf21.0 MB
    Download
  • FIC Carding Room Plumbing CA Ph III.pdf
    application/pdf471 KB
    Download

Contacts

  • Mike Whiteman

Explore more