nc_evpNCGASTON-COLLEGE
GASTON COLLEGE / Beam Administration Building AHU Redesign
3 open solicitations
Linked solicitations
- Provide and install mechanical, electrical and plumbing equipment in the Beam Administration building to remove the steam powered heating system and provide a hot water heating system. The air hand…open98-26-015NCDue Sep 17, 2026
- Project includes providing and installing mechanical, electrical and plumbing equipment in the Lena Sue Beam building to remove the steam powered heating system and provide a hot water heating syst…open98-26-014NCDue Aug 12, 2026
- Provide multiple new compressed air drops with new piping to match existing down from the existing ceiling level compressed air system to the new owner provided manufacturing equipment. Provide all…open98-31280NCDue Jul 14, 2026