Civic AI
Civic AI
Procurement intelligence
nc_evp98-26-014
Open

Project includes providing and installing mechanical, electrical and plumbing equipment in the Lena Sue Beam building to remove the steam powered heating system and provide a hot water heating syst…

GASTON COLLEGE / Lena Sue Beam Boiler Addition Project · NC
Response deadline
Aug 12, 2026
Due in 26 days
Date posted
Jul 14, 2026

Description

Project includes providing and installing mechanical, electrical and plumbing equipment in the Lena Sue Beam building to remove the steam powered heating system and provide a hot water heating system. Air purifiers are to be installed on the air handlers.

Documents (2)

  • Bid Set - LSB Boiler Addition.pdf
    application/pdf4.1 MBNot yet available
  • Project Manual - LSB Boiler Addition 1.pdf
    application/pdf4.2 MBNot yet available

Contacts

  • Dashawn Biddy

Explore more