Civic AI
Civic AI
Procurement intelligence
hi_hieproB27000469
Open

ER-27(008) Kaumualii Hwy Drainage Imp Vic of Omao Stream Bridge

Response deadline
Oct 29, 2026
Due in 13 days
Date posted
Sep 29, 2026

Description

The scope of work includes but is not limited to: demolition and removal of existing drainage structure, concrete apron, asphalt concrete pavement and chain link fencing; fill the existing 24” RCP drain pipe crossing Kaumualii Highway with controlled low-strength material (CLSM) and abandon in place; installation of 42” reinforced concrete pipe; installation of drain manhole, grated drain inlets and concrete outlet structure; installation of grouted rubble paving, reinforced concrete apron and asphalt concrete pavement; installation of chain link fencing and erosion control matting; clearing and grubbing; excavation; backfilling; grading; and grassing.

Documents (3)

  • FINAL SPECIFICATIONS w NTB ER 27 008.pdf
    application/pdf;charset=UTF-87.2 MBNot yet available
  • FINAL PLANS ER 27 008.pdf
    application/pdf;charset=UTF-816.5 MBNot yet available
  • FINAL GEOTECHNICAL EXPLORATION REPORT ER 27 008.pdf
    application/pdf;charset=UTF-86.8 MBNot yet available

Contacts

Similar contracts

Explore more