hi_hieproB27000415
Open
STP-0377(008) Seismic Retrofit, Haleakala Hwy, 3 Bridges, Maui
- Response deadline
- Oct 15, 2026 Due in 15 days
- Date posted
- Sep 15, 2026
- Source
- Open notice
Description
The scope of work consists of seismic retrofit of the Waiale Gulch, Alae (Naalae Gulch), and Pulehu Gulch (Pohakuokala) Bridges. Improvements include removal of debris from the piers; wrapping the piers with carbon fiber, removal of a portion of the backfill from behind the abutments and backfilling with CLSM and tying the abutment to the CLSM backfill; replacement of the creep blocks at the bents; pier footing upgrades; installing pavement, pavement markers, and temporary erosion control measures; installing scour countermeasures near Alae Bridge Pier 1; and traffic control.
Documents (3)
- FINAL SPECIFICATIONS w NTB STP 0377 008.pdfapplication/pdf;charset=UTF-83.3 MBNot yet available
- FINAL PLANS STP 0377 008.pdfapplication/pdf;charset=UTF-838.1 MBNot yet available
- STP 0377 008 ATTACHMENTS.zipNot yet available
Contacts
- huijin.park@hawaii.gov808-587-2139
Similar contracts
- Stp-0700(098), Intelligent Transportation Systems Kauai, Part 1HIDue Oct 26, 2026
- NH-093-1(035) Farrington Highway WideningHIDue Oct 27, 2026
- HWY-OM-2027-38 Sidewalk, Curb/Gutter, Conc Med Barr Rep, OahuHIDue Sep 25, 2026
- HWY-02-27M HDOT Punchbowl Office RenovationHIDue Oct 6, 2026
- HWY-OM-2027-36 Pavement Marking Repairs at Various LocationsHIDue Oct 1, 2026
- NH-072-1(057) Kal Hwy Resurfacing Makai Pier to Hanauma Bay RdHIDue Oct 15, 2026