hi_hieproB27000417
Open
Stp-0700(098), Intelligent Transportation Systems Kauai, Part 1
- Response deadline
- Oct 26, 2026 Due in 26 days
- Date posted
- Sep 15, 2026
- Source
- Open notice
Description
The scope of work consists of construction of concrete base for traffic signal cabinet, (traffic signal cabinet by other), trenching and installation of underground conduits and pullboxes to connect the concrete base for the traffic signal cabinet to the existing traffic signal pull box, power source, and to the broadband signal source, and restorations work.
Documents (2)
- Specifications-FINAL SPECIFICATIONS w NTB STP 0700 098.pdfapplication/pdf;charset=UTF-84.4 MBNot yet available
- Plans-FINAL PLANS STP 0700 098.pdfapplication/pdf;charset=UTF-810.8 MBNot yet available
Contacts
- alan.c.hilton@hawaii.gov808-587-1990
Similar contracts
- STP-0377(008) Seismic Retrofit, Haleakala Hwy, 3 Bridges, MauiHIDue Oct 15, 2026
- NH-093-1(035) Farrington Highway WideningHIDue Oct 27, 2026
- HWY-OM-2027-38 Sidewalk, Curb/Gutter, Conc Med Barr Rep, OahuHIDue Sep 25, 2026
- HWY-02-27M HDOT Punchbowl Office RenovationHIDue Oct 6, 2026
- HWY-OM-2027-36 Pavement Marking Repairs at Various LocationsHIDue Oct 1, 2026
- NH-072-1(057) Kal Hwy Resurfacing Makai Pier to Hanauma Bay RdHIDue Oct 15, 2026