ga_gprPE-66276-NONST-2027-000000027
Open
City of Social Circle Little River Water Pollution Control Plant
- Response deadline
- Sep 17, 2026 Due in 37 days
- Date posted
- Aug 10, 2026
- Source
- Open notice
Description
Contract 1: Sewerage System Improvements installing approximately 3,600 linear feet of DIP and PVC sewer including manholes, jack and bore, rock excavation, clearing, soil erosion and sediment control, and appurtenances. Time allotted for construction 270 consecutive calendar days. Contract 2: Little River Water Pollution Control Plant to include a screen and grit structure, (2) two aeration basins, two (2) final clarifiers, tertiary filters, ultraviolet disinfection unit, sludge pump station, plant pump station, chemical feed facilities, control building, digester and sludge dewatering building, all complete with appurtenances. Time allotted for construction is 480 consecutive calendar days and 540 days for final completion.
Classifications
- NAICS93462
Documents (1)
- 2790_001.pdfapplication/pdf63 KBNot yet available
Contacts
- aaddenbrook@turnipseed.com706-863-8800