26-U-4788 Gas Easement Remediation
- Response deadline
- Jul 9, 2026 Closed
- Date posted
- Jun 10, 2026
- Source
- Open notice
Description
The work to be performed and provided under this Contract shall consist of furnishing all labor, materials, tools, equipment, safety equipment, permitting, erosion and sedimentation control measures, taxes, profit, overhead, and other costs and effort required to complete the following: Installation of approximately 144 L.F. of 36¿ reinforced concrete pipe (RCP) for nine (9) culvert crossings, nine (9) RCP flared end sections with trash racks, 270 S.Y. of type 3 riprap, access drive improvements to include installation of 4,000 S.Y. of 200-lb woven fabric and 720 TN of #4 surge stone, and associated grading and erosion and sedimentation control. The time allotted for final completion of work is 90 consecutive calendar days. Contractor will be required to coordinate all work with the City of Warner Robins and other utility owners who have facilities within the project corridor. The project will be managed by GWES, LLC. located at 733 Carroll Street, Perry, GA, 31069, telephone number (478) 235-0307. All Work shall be completed in accordance with the plans and specifications. The Work will be awarded in one (1) Contract.
Classifications
- NAICS91356
Documents (2)
Contacts
- Allison Lanneaualanneau@wrga.gov478-302-5538