Eastern Water Distribution System Reliability Project
- Response deadline
- Dec 14, 2026 Due in 37 days
- Date posted
- Nov 6, 2026
- Source
- Open notice
Description
Construct the Eastern Water Distribution System Reliability Project as shown in the drawings and specifications. The project will include the construction of multiple roads: Tibbs Bridge Rd, Headrick Circle, N. Woodland Dr, Keeter Rd, Riverside Dr, North Dr, Timberlake Dr, Sane Rd, Cavender Rd, Riverbend Rd, Bettis Rd, Gordon Dr, Shirley Dr, Matha Sue Dr, Leon Cr, Conasauga Way, Deal Dr, Greenson Bend, Jackson Kinnamon, Ridley Rd, Callie Jones, Barney Pierce, Thorton Rd, Adam Rd, Stafford Rd, Keswick Dr, Pannel Dr, Cochran Dr, Hwy 225, Hwy 52 Alt, Crestview Dr, Vann Cr, & Mary Sue. Rehab will consist of replacing existing pipe infrastructure, valves, fire hydrants, installing new services, connecting existing mains, driveway crossing (rock/concrete), etc.
Classifications
- NAICS91356
Documents (1)
- RFP for Eastern Water Distribution Reliabilit.pdfapplication/pdf11.8 MBNot yet available
Contacts
- rromero@dutil.com7065291075
Similar contracts
- 2027 Dalton Telecom Conduit ProjectGADue Dec 17, 2026
- Harris Grove Subdivision Site Construction ProjectGADue Nov 17, 2026
- Bid Ref. #27-030 Albany Pipe Rehabilitation - Phase IGADue Nov 11, 2026
- Bid Ref. #27-025 Water System Valve ExercisingGADue Oct 27, 2026
- Inner Perimeter Road Water LinesGADue Oct 22, 2026
- RFP - Engineering & Management Services - Steel Natural Gas Main ReplacementGADue Oct 29, 2026