Water Treatment Plant Maintenance Package ‘A’ Degasifier Package (Project No. 25-4261A)
- Response deadline
- Oct 14, 2026 Due in 34 days
- Date posted
- Sep 9, 2026
- Source
- Open notice
Description
The Work to be performed under this Contract consists of constructing the Work shown in the Contract Documents and described below. This Work consists of all the improvements, and all related appurtenances, incidentals, and General Conditions. The Work is generally described as follows: Replacement of packing media in three degasifiers (units 2, 3, and 4) with additional servicing of the units, including power washing of the vessel interiors, repairs, replacement of media support grids, replacement of the differential pressure gauges, vessel disinfection, and resealing of the access doors. The Work shall be performed one unit at a time while maintaining the operation of the other degasifier units. The Work is located at the following address: City of Hollywood Water Treatment Plant 3441 Hollywood Boulevard Hollywood, Florida 33021 Contracting Method: Work shall be constructed under one prime contract.
Documents
No documents posted for this opportunity.
Similar contracts
- Rockwell Automation/Allen-Bradley PLC PartsFLDue Sep 10, 2026
- Johnson Street and I-95 Drainage Culvert (Project No. 24-11064)FLDue Sep 22, 2026
- Rehabilitation of the Oxygenation Train #3 (Project # 24-9422)FLDue Sep 16, 2026
- Vactor Repairs and PumpsFLDue Aug 5, 2026
- Annual Maintenance Service of Sand FiltersFLDue Jul 16, 2026
- Filter Feed Pump Station Rehabilitation at Wastewater Treatment PlantFLDue Sep 1, 2026