Water Treatment Plant Maintenance Package 'B'; Project No. 25-4262
- Response deadline
- Dec 3, 2026 Due in 37 days
- Date posted
- Oct 26, 2026
- Source
- Open notice
Description
Demolition and installation of process systems and equipment at the City of Hollywood Water Treatment Facility. Major work elements include removal and replacement of lime slaker systems no. 2 and 3, including associated pumps, tanks, piping, valves, electrical, controls, and structural repairs; demolition and replacement of the filter surface wash system; demolition and replacements of the sodium hexametaphosphate (SHMP) feed system, including new equipment pads, trench grating, electrical, controls, and flow monitoring; and demolition and replacement of sludge pump piping, flushing water line, and reconfiguration of the existing standby sludge pump. All work shall include start-up, testing, and commissioning as required to provide fully operational systems.
Documents
No documents posted for this opportunity.
Similar contracts
- Meter Transmission Unit / VertexOne Consumer PortalFLDue Nov 2, 2026
- Water Treatment Plant MS/RO Chemical Area Recoating; Project No. 25-4262AFLDue Dec 3, 2026
- Chlorine Facility Maintenance WWTPFLDue Oct 28, 2026
- Water Treatment Plant Maintenance Package ‘A’; Project No. 25-4261FLDue Nov 25, 2026
- SW-2 Bypass Pumping & Rehabilitation (Project No. 25-11070A)FLDue Nov 25, 2026
- Professional Services Related to Water and Wastewater Distribution, Transmission & Wastewater Collection Program Management (Project No. 26-1352)FLDue Nov 17, 2026