Lift Station E-08 Backup Electrical Power Generator (Project No. 25-8071A)
- Response deadline
- Dec 9, 2026 Due in 35 days
- Date posted
- Nov 3, 2026
- Source
- Open notice
Description
The work to be performed includes site, civil, structural and electrical work associated with the construction of LS E-08 Backup Electrical Power Generator Project in the City of Hollywood. The work to be performed includes but is not limited to the removal of existing generator, fuel tank, electrical items, installation of new emergency generator that is designed to be protected against a 500-year flood event, fuel tank, access for maintenance with all ancillary equipment as required, as shown on the plans. The construction activities include but are not limited to survey, locating and protecting existing utilities, maintenance of traffic, soil boring, dewatering, electrical equipment installation, restoration, furnishing and installing emergency generator, temporary MOT, maintaining building access, maintaining continuous sanitary service and property access, coordination with different agencies such as the City, FEMA, AT&T, and FPL, preparation and submittal of shop drawings and record drawings, testing, and other repairs or restorations. Work shall be performed to ensure continuous operation and appropriate performance of all existing water, sewer, stormwater and franchise utilities systems, to minimize impacts to roadway traffic, parking, residents and/or businesses and shall be coordinated with the City in advance. It is the intent of the City to obtain a complete and working installation under this contract and any items of labor, materials or equipment, which may reasonably be assumed as necessary to accomplish this end, should be supplied whether or not specifically shown on the plans or described herein. Maintenance of the existing utility systems is mandated throughout the construction period.
Documents
No documents posted for this opportunity.
Similar contracts
- Lift Station W-27 Upgrades and Force Main Replacement (Project No. 23-8073)FLDue Dec 9, 2026
- Septic to Sewer and Water Main Replacement Blvd Heights (Projects No. 22-7114 and 25-5153)FLDue Dec 9, 2026
- Rapid Field Overhaul Kits and Field Labor for Compressor UnitsFLDue Nov 4, 2026
- Water Treatment Plant Maintenance Package 'B'; Project No. 25-4262FLDue Dec 3, 2026
- Meter Transmission Unit / VertexOne Consumer PortalFLDue Nov 2, 2026
- Water Treatment Plant MS/RO Chemical Area Recoating; Project No. 25-4262AFLDue Dec 3, 2026