Civic AI
Civic AI
Procurement intelligence
OpenGov / IonwaveIFB-442-26-JM
Open

SW-2 Bypass Pumping & Rehabilitation (Project No. 25-11070A)

Response deadline
Nov 25, 2026
Due in 35 days
Date posted
Oct 20, 2026

Description

The City of Hollywood Department of Public Utilities is seeking qualified contractors for the Stormwater Pump Station No. 2 (SW-2) Bypass Pumping & Rehabilitation project (Project No. 25-11070) located along South 8th Avenue and North Southlake Drive . The primary objective of this project is to execute comprehensive structural rehabilitation, pump well modifications, and site infrastructure upgrades to modernize and restore full operational performance to the SW-2 stormwater pumping facility . To maintain essential uninterrupted stormwater service during construction, Phase 1 requires the contractor to establish and operate a fully automated, 20,000 GPM bypass pumping system utilizing MWI hydraulic pumps, temporary discharge piping over the seawall, concrete equipment pads, and security fencing . Once the bypass system is proven operational for one week, Phase 2 structural rehabilitation will commence . Scope for this phase includes demolition of existing pump well top slabs and apparatus, pouring a new reinforced concrete top slab, executing localized CMU wall and concrete spall/crack structural repairs, and installing new pumping equipment and control drive units . The final phase involves full site restoration, including removing all temporary bypass piping and equipment, restoring affected asphalt pavement, concrete sidewalks, and sodded areas, and ensuring all drainage structures and outfalls meet municipal standards . Qualified vendors with strong expertise in municipal utility infrastructure, temporary flow bypass management, and heavy structural concrete restoration are invited to submit bids .

Documents

No documents posted for this opportunity.

Similar contracts

Explore more