DJT Airfield Vault Building Expansion
- Response deadline
- Oct 13, 2026 Due in 4 days
- Date posted
- Oct 2, 2026
- Source
- Open notice
Description
DJT Airfield Vault Building Expansion The work generally consists of: The expansion of the existing airfield electrical vault by approximately 2,500 square feet and includes interior renovation of the existing structure and replacement of the existing roof. The work includes modifications to the existing HVAC system and Fire Protection system. The expansion increases the vault electrical capacity also includes the relocation of the existing regulators, ALCMS control system, fiber optic cable power and communication wiring. Replacement of the standby emergency power generator is included as an additive alternate bid item. Commodity lines: - Airport Facility Construction - Demolition Services - Clearing and Grubbing Services - Sod, Grass - Excavation Services - Construction, General (Backfill Services, Digging, Ditching, - Electrical - Geotechnical - Soils - Testing Services - Concrete - Grass, Sod and Topsoil In Place - Utility Services, Electric - ELECTRICAL EQUIPMENT AND SUPPLIES (EXCEPT CABLE AND WIRE) - ELECTRICAL CABLES AND WIRES (NOT ELECTRONIC) - Site Work - Roofing and Siding - Insulation - Masonry - Painting, Maintenance and Repair Services (Including Caulkin - Signage (Includes Destination, Routing and Advertising) - Heating, Ventilating and Air Conditioning (HVAC) - C.I.P., Fire Alarm System
Classifications
- NAICS90910
Documents (7)
- PB 26-12 Bid Price Form (BF 4.1 -4.4).xlsxNot yet available
- 03-PB 26-12 ad-InvtoBid Confidential.pdfNot yet available
- PB 26-12 DJT Airfield Vault Expansion Bid Documents Part-1.pdfNot yet available
- PB 26-12 DJT Airfield Vault Expansion Bid Documents Part-2.pdfNot yet available
- PB 26-12 Addendum 1.pdfNot yet available
- LN 26-13 Addendum 1.pdfNot yet available
- PB 26-12 Addendum 2.pdfNot yet available
Contacts
- fgaines@pbc.gov561-687-5944
Similar contracts
- LNA Southside Redevelopment Program Phase 3FLDue Oct 20, 2026
- Bid documents areavailable for download via the Cobblestone Vendor Gateway found at followinglink: Bids The Texas Parks and Wildlife Department willhost a pre-bTXDue Nov 3, 2026
- LNA Southside Redevelopment Program Phase 3FLDue Oct 20, 2026
- 27-009 Temporary Fire Station HousingGADue Oct 15, 2026
- (BID) 27-18, Atlanta Speedway Airport Hangar Site DevelopmentGADue Oct 8, 2026
- LNA Southside Redevelopment Program Phase 3FLDue Oct 6, 2026