LNA Southside Redevelopment Program Phase 3
- Response deadline
- Oct 20, 2026 Due in 20 days
- Date posted
- Sep 22, 2026
- Source
- Open notice
Description
LNA Southside Redevelopment Program Phase 3 The work generally consists of: The expansion of the existing airfield electrical vault by approximately 2,500 square feet and includes interior renovation of the existing structure and replacement of the existing roof. The work includes modifications to the existing HVAC system and Fire Protection system. The expansion increases the vault electrical capacity also includes the relocation of the existing regulators, ALCMS control system, fiber optic cable power and communication wiring. Replacement of the standby emergency power generator is included as an additive alternate bid item. Commodity lines: - Airport Facility Construction - Demolition Services - Clearing and Grubbing Services - Construction, General (Backfill Services, Digging, Ditching, - Testing Services - Concrete - Grass, Sod and Topsoil In Place - Utility Services, Electric - ELECTRICAL EQUIPMENT AND SUPPLIES (EXCEPT CABLE AND WIRE) - ELECTRICAL CABLES AND WIRES (NOT ELECTRONIC) - Site Work - Pavement Marking Services (Including Removal of Markings) - Striping Streets, Parking Facilities, Lane Divisions, etc. ( - Construction, Highway and Road - Quality Control Testing Services for Construction - Storm Drainage - Erosion Control Services - Surveyor Services, Land - Milling Services: Asphalt - Asphaltic Concrete, Hot Laid Including Bituminous Materials - Paving/Resurfacing, Highway and Road - Paving/Resurfacing, Street (Major and Residential) - ROAD AND HIGHWAY BUILDING MATERIALS (ASPHALTIC) - Construction, Pipe Culvert - Construction, Irrigation System - Landscaping (Including Design, Fertilizing, Planting, etc., - Construction, Sidewalk and Driveway (Includes Pedestrian and - Card Access Security Services - Access Control Systems and Security Systems - Construction, Curb and Gutter (Includes Maintenance, Repair, - Electric Fence Controllers and Accessories - Gates, Electric (Including Card Readers, etc.) - Lighting, Area, Pole or Standard Mounted (Parking Lots, etc. - Utility Services, Water - Public Utilities: Water, Sewer and Gas Maintenance and Repai - Construction, Water System/Plants, Main and Service Line - Communication Systems, Including Infrastructure
Classifications
- NAICS90910
Documents (3)
- LN 26-13 Southside Redevelopment Phase 3_Bid Documents.pdfNot yet available
- LN 26-13 Addendum 1.pdfNot yet available
- 03-LN 26-13 ad-InvtoBid Confidential.pdfNot yet available
Contacts
- fgaines@pbc.gov561-687-5944
Similar contracts
- 27-009 Temporary Fire Station HousingGADue Oct 15, 2026
- (BID) 27-18, Atlanta Speedway Airport Hangar Site DevelopmentGADue Oct 8, 2026
- LNA Southside Redevelopment Program Phase 3FLDue Oct 6, 2026
- DJT Airfield Vault Building ExpansionFLDue Oct 6, 2026
- 26-182 Boykin Road Park Improvements ProjectGADue Aug 18, 2026
- Runway Rehabilitation - Vidalia Regional AirportGADue Aug 6, 2026