Well No. 10 GAC Treatment and System Upgrades
- Response deadline
- Nov 5, 2026 Due in 20 days
- Date posted
- Oct 6, 2026
- Source
- Open notice
Description
The Project includes, without limitation, furnishing all necessary labor, materials, equipment and other incidental and appurtenant work necessary to satisfactorily complete the Project, as more specifically described in the Contract Documents. The project involves site clearing, demolition, and infrastructure salvage. At the Well No. 10 site, the Contractor shall procure and install a new well pump and motor and reconfigure the vault piping and pressure reducing valve (PRV) station to integrate the new treatment stream. The vault scope also includes rebuilding the PRV, coating below-grade piping, and replacing existing exhaust fans, flow meters, and the static mixer. Additionally, the Contractor shall furnish and install a Granular Activated Carbon (GAC) system with four steel pressure vessels, prefilters, and a bolted steel backwash tank. The scope further includes a sodium hypochlorite (SHC) disinfection system with a covered facility for chemical storage and dosing, along with integrated containment and monitoring systems. Final deliverables include complete electrical and instrumentation integration into the onsite SCADA system, yard lighting, and site civil works, including a new central access drive, equipment pads, and a stormwater drywell system.
Documents (6)
- APPENDIX A - PROJECT PLANS_AM_SIGNED.pdfNot yet available
- APPENDIX B - GEOTECHNICAL REPORT.pdfapplication/pdf2.5 MBNot yet available
- APPENDIX C - WATER QUALITY DATA.pdfapplication/pdf10.7 MBNot yet available
- APPENDIX E - CITY OF NORWALK STANDARD PLANS.pdfapplication/pdf30.9 MBNot yet available
- APPENDIX D - WRD FUNDING COMPLIANCE REQUIREMENTS.pdfapplication/pdf229 KBNot yet available
- City of Norwalk Bid Specification - Final_Signed_10-5-2026_R.pdfNot yet available
Contacts
- cenriquez@norwalkca.gov562-929-5926
Similar contracts
- Consulting Services to Update Norwalk Transit System (NTS) existing Title VI ProgramCADue Oct 21, 2026
- Utility Bill Printing & Mailing ServicesCADue Oct 22, 2026
- Body Repair and Painting Services for Small-Medium Duty Vehicles and Equipment for Norwalk Transit System (Nts)CADue Oct 22, 2026
- Supply and Deliver Ford Original Equipment Manufacturer (Oem) Parts and Repair Services for Norwalk Transit System (Nts)CADue Oct 22, 2026
- Advanced Reservation and On-Demand Dial-A-Ride Subscription Services, Paratransit Demand Response User Side Subsidy Transportation Program and Microtransit ServiceCADue Dec 11, 2026
- 2026 Stuff-A-Bus ProjectCADue Oct 9, 2026