Traffic Signal and Fiber Optic Communication Improvements along Pioneer Boulevard from 166th Street to Lakeland Road
- Response deadline
- Jul 29, 2026 Due in 10 days
- Date posted
- Jun 29, 2026
- Source
- Open notice
Description
The Project includes, without limitation, furnishing all necessary labor, materials, equipment and other incidental and appurtenant work necessary to satisfactorily complete the Project, as more specifically described in the Contract Documents. Works consists of traffic signal, fiber optic communication, ITS, and ADA ramp improvements along Pioneer Boulevard from 166th Street to Lakeland Road, and includes, but not limited to furnishing and installing conduit, pull boxes, countdown pedestrian signal heads, accessible pedestrian signals and push buttons, push button posts, traffic signal poles, traffic signal cabinets, advanced transportation controllers, malfunctioning monitoring units (MMU), battery backup systems (BBS), service cabinets, video detection systems, detector loops, safety lighting, luminaires, internally illuminated street name signs, traffic signal cabinets, communication hub cabinets, fiber optic cable, advanced transportation controllers, fiber distribution units, fiber optic splicing, wireless radios, and Ethernet switches. Contractor shall be fully installed, configured, integrated, tested and commissioned to the manufacturer's specifications, these Special Provisions, and the project plans.
Documents (1)
- DownloadIFB No. 26-869 Project No 7239 and 7240 - Pioneer Blvd.pdfapplication/pdf22.0 MB
Contacts
- Isiah Coronaicorona@norwalkca.gov562-929-5778