Traffic Signal and Fiber Optic Communication Improvements along Pioneer Boulevard from 166th Street to Lakeland Road
- Response deadline
- Aug 4, 2026 Closed
- Date posted
- Jun 29, 2026
- Source
- Open notice
Description
The Project includes, without limitation, furnishing all necessary labor, materials, equipment and other incidental and appurtenant work necessary to satisfactorily complete the Project, as more specifically described in the Contract Documents. Works consists of traffic signal, fiber optic communication, ITS, and ADA ramp improvements along Pioneer Boulevard from 166th Street to Lakeland Road, and includes, but not limited to furnishing and installing conduit, pull boxes, countdown pedestrian signal heads, accessible pedestrian signals and push buttons, push button posts, traffic signal poles, traffic signal cabinets, advanced transportation controllers, malfunctioning monitoring units (MMU), battery backup systems (BBS), service cabinets, video detection systems, detector loops, safety lighting, luminaires, internally illuminated street name signs, traffic signal cabinets, communication hub cabinets, fiber optic cable, advanced transportation controllers, fiber distribution units, fiber optic splicing, wireless radios, and Ethernet switches. Contractor shall be fully installed, configured, integrated, tested and commissioned to the manufacturer's specifications, these Special Provisions, and the project plans.
Documents (1)
- DownloadIFB No. 26-869 Project No 7239 and 7240 - Pioneer Blvd.pdfapplication/pdf22.0 MB
Contacts
- icorona@norwalkca.gov562-929-5778
Similar contracts
- Public Art Sculpture at Norwalk Cultural Arts CenterCADue Oct 15, 2026
- Enterprise Resource Planning (ERP) Advisory and Procurement Services ConsultantCADue Sep 24, 2026
- Cip 7945 Streets Rehabilitation on Excelsior Drive Between Pioneer Boulevard and Bloomfield Avenue, Front Street Between Pioneer Boulevard and San Antonio Drive, and Foster Road Between StudebakeCADue Sep 4, 2026
- TopdresserCADue Aug 31, 2026
- Fence Repair at Public Services YardCADue Aug 25, 2026
- Comprehensive Operational Analysis (Coa) for Norwalk Transit System (Nts)CADue Sep 3, 2026