589A5-22-122 Relocate Oit from 6Th Fl to Bldg 21 Me
- Response deadline
- Aug 28, 2026 Closed
- Date posted
- Jul 23, 2026
- Source
- Open notice
Description
Page 74 of 91 COLMERY ONEIL VA MEDICAL CENTER TOPEKA, KANSAS Relocate OIT Offices Bldg. 1 6th Floor & Renovate Space - Project 589A5-22-122 CONSTRUCTION STATEMENT of WORK (SOW) 1. SCOPE: This specification herein describes a construction project SOW. This work includes the following items: Relocate OIT from 6th Floor Commissioning As-built drawings The contractor will be responsible for meeting all contract specifications for the VAMC. The contractor shall provide all labor, material, and equipment to perform the work. All project work shall be installed in accordance with all applicable standards available at time of installation to include published commercial specifications as well as standards and preferences expressed in this document. All installation details shall be fully coordinated with VA CO and on-site Contracting Officer s Representative (COR). Period of Performance for all work is 330 days. The contract will receive an I\initial Notice to Proceed for Administrative Work. This 30-day period allows time to process contractor employee background checks to operate on VAMC property and to review and approve all required submittals to start physical construction. A Notice to Proceed for construction will be issued at the end of the 30-day period. 2. STATEMENT OF WORK: 2.1 RELOCATE OIT FROM 6TH FLOOR As provided in the contract documents this project will engage a Contractor to furnish all labor, tools, material, equipment, and supervision to renovate building 21 space for relocating OIT form Building 1. Work includes general construction, alterations, necessary removal of existing structures and construction, plumbing, HVAC, electrical, interior finishes, and certain other items as identified in the construction drawings and specifications. 2.2 COMMISSIONING The contractor shall provide all labor, material, and equipment to test, balance, and commission the Building 21 OIT space. 2.3 AS-BUILT Drawings The contractor shall provide all labor, material, and equipment to produce and provide pdf as-built drawings. Exceptions: Contractor shall be responsible for meeting all fire, safety, and VA standards (VA handbook) as specified in Statement of Work, Drawings, and Specifications. The Authorization requirements do not apply, and that a Security Accreditation Package is not required.
Classifications
Documents (5)
- Appendix 2- VAAR 852.219-75 VA Limitations on Subcontracting 02.docx.docx15 KBNot yet available
- Appendix 1- Price Breakdown and Calculation of Self-Performed Work- 589A5-22-211 02.docx.docx22 KBNot yet available
- 36C25526R0150_1.docx.docx166 KBNot yet available
- P01- Final DRAWINGS-20240522 589A5-22-122-RelocateOIT Final .pdf.pdf7.8 MBNot yet available
- P01- Bid Specs- 0240522 589A5-22-122 16662201 RelocateOIT.pdf.pdf8.2 MBNot yet available
Contacts
- Contract Specialistdavid.sterrett@va.gov913-946-1146
Similar contracts
- 2-STEP SEALED BID - TINKER AFB WWYK250019 Remove and Replace Fire Sprinkler in Plasma Booth Dust Collectors and Replace the Building F/A System, B3221OklahomaDue Oct 30, 2026
- Sources Sought / Market Intelligence: Multi-Projects for Army Reserve Program – Construction Management at Risk (CM@Risk) utilizing Other Transaction Authority (OTA)Due Oct 5, 2026
- PLA Survey for Human Performance Wig Lab at WPAFBOhioDue Oct 7, 2026
- HST Roof Safety Construction ProjectDistrict of ColumbiaDue Oct 19, 2026
- Construct US Space Force Integration Facility, F/10852 Wpafb, OhioOhioDue Oct 6, 2026
- Fort Lee Vehicle Recovery RangeVirginiaDue Oct 13, 2026