OpenGov / IonwaveS-14-26
Open
2026 Surface Seal
- Response deadline
- Jul 13, 2026 Closed
- Date posted
- Jun 16, 2026
- Source
- Open notice
Description
This project generally consists of pavement preservation improvements through localized asphalt patching and application of a Type II emulsified asphalt slurry seal treatment. The work includes traffic control, flagging operations, and surface preparation necessary to extend the service life of existing roadways. Additional improvements include installation of thermoplastic pavement markings, crosswalk bars, stop bars, and school zone symbols to restore traffic control devices and enhance roadway safety following completion of the slurry seal operations.
Documents
No documents posted for this opportunity.
Similar contracts
- Van Buren Ave - Street Curb and Gutter ImprovementsWYDue Oct 27, 2026
- One (1) New In-Stock Special Operations SUV (SSV Platform) for Cheyenne Fire RescueWYDue Sep 8, 2026
- One New 2026 Or Newer Cab & Chassis, 4x4, With 12 Ft. Forestry Chipper Dump BedWYDue Sep 8, 2026
- Compost Facility Waste Hauling - 2026WYDue Sep 4, 2026
- Cheyenne MPO 24 Hour Traffic Counts - 2026WYDue Aug 11, 2026
- Southeast MPO Future Road Network StudyWYDue Aug 12, 2026