OpenGov / IonwaveS-12-26
Open
2026 Miscellaneous Concrete
- Response deadline
- Jul 14, 2026 Closed
- Date posted
- Jun 16, 2026
- Source
- Open notice
Description
This project generally consists of concrete roadway and pedestrian infrastructure rehabilitation, including excavation, asphalt patching, concrete pavement replacement, curb and gutter reconstruction, sidewalk improvements, drive approach replacements, and drainage structure upgrades. The work also includes utility adjustments, inlet replacement, erosion and stormwater control measures, and restoration of disturbed landscaping and irrigation systems. Additional improvements include installation of ADA-compliant detectable warning plates, replacement of signage, and application of thermoplastic crosswalk and stop bar pavement markings to enhance pedestrian accessibility and traffic safety.
Documents
No documents posted for this opportunity.
Similar contracts
- Van Buren Ave - Street Curb and Gutter ImprovementsWYDue Oct 27, 2026
- One (1) New In-Stock Special Operations SUV (SSV Platform) for Cheyenne Fire RescueWYDue Sep 8, 2026
- One New 2026 Or Newer Cab & Chassis, 4x4, With 12 Ft. Forestry Chipper Dump BedWYDue Sep 8, 2026
- Compost Facility Waste Hauling - 2026WYDue Sep 4, 2026
- Cheyenne MPO 24 Hour Traffic Counts - 2026WYDue Aug 11, 2026
- Southeast MPO Future Road Network StudyWYDue Aug 12, 2026