Civic AI
Civic AI
Procurement intelligence
vt_business76182
Open

Town of Middlesex – Old Brook Road Slope Stabilization

Response deadline
Oct 7, 2026
Due in 9 days
Date posted
Oct 7, 2026

Description

The Town of Middlesex (Town) is requesting bids from qualified contractors for the stabilization of a steam bank and roadway embankment along Old Brook Road. This project consists of a Mechanically Stabilized Earth (MSE) wall supporting the roadway's southbound (western) lane. The MSE wall will be supported by a soil nail stabilized slope extending down to the slope toe. Stone fill armoring will be placed at the toe of the slope and will be keyed into the bedrock to provide further stability. The contractor will be responsible for the final design of the soil nail stabilization system and the MSE wall. To request the construction drawings and specifications prepared by Fitzgerald Environmental Associates (FEA) and GEODesign, reach out to Jordan Duffy at jordan@feavt.com and copy Alan Baribault at abaribault@geocompanies.com. Keywords: Construction (Non Building), Stream Restoration Locations: Washington Site visit: 9/29/2026 9:30:00 AM A mandatory pre-bid site visit is scheduled for Tuesday, September 29th at 9:30 AM. Interested contractors shall meet near 49 Old Brook Road in Middlesex.

Classifications

Documents (1)

  • 2026-09-25-Middlesex_OldBrookRoad_RequestForBid.pdf
    Not yet available

Contacts

Similar contracts

Explore more