Town of Middlesex - Daniels Farm Rd Culvert Replacement
- Response deadline
- Oct 7, 2026 Due in 9 days
- Date posted
- Oct 7, 2026
- Source
- Open notice
Description
The Town of Middlesex (Town) is requesting bids from qualified contractors for a stream crossing replacement on Daniels Farm Rd. This project consists of removing a partially failed timber bridge with stacked stone and concrete abutments, and installation of a 12’ x 8’ pre-cast concrete box culvert with headwalls and wing walls at the inlet and outlet. To request the construction drawings prepared by Fitzgerald Environmental Associates (FEA) reach out to Jordan Duffy at jordan@feavt.com. Keywords: Construction (Non Building), Stream Restoration Locations: Washington Site visit: 9/29/2026 9:00:00 AM A mandatory pre-bid site visit is scheduled for Tuesday, September 29th at 9 AM. Interested contractors shall meet at 52 Daniels Farm Road in Middlesex.
Classifications
Documents (1)
- 2026-09-25-MiddlesexCulvertReplacement_DanielsFarmRoad_RequestForBid.pdfNot yet available
Contacts
- jordan@feavt.com(802) 876-7778
Similar contracts
- Town of Middlesex – Old Brook Road Slope StabilizationVTDue Oct 7, 2026
- Town of Berlin - Streambank ProtectionVTDue Aug 13, 2026
- Barnard Brook at Woodstock Garden Bank StabilizationVTDue Oct 20, 2026