Pre-Qualification for Maintenance Shop Renovations at Noman M. Cole JR. Water Recycling Facility
- Response deadline
- Sep 10, 2026 Due in 27 days
- Date posted
- Aug 14, 2026
- Source
- Open notice
Description
The work shall include but may not be limited to the following: ⢠Demolition of interior finishes, shop equipment, doors, partitions, etc. at Building 'A', Building 'A2', and Building 'T'.⢠Providing new partitions, doors, finishes, etc. at Building 'A', Building 'A2', and Building 'T' where indicated.⢠Providing new shop equipment and relocating existing shop equipment.⢠Providing replacement of existing HVAC system, vents, ductwork, and other mechanical equipment.⢠Providing new plumbing fixtures, piping, and connections.⢠Providing new electrical outlets and light fixtures. ⢠Performing work in separate construction phases, as required for renovation of Owner-occupied spaces within areas of work.The work will take place within the NMCWRF, a 67 million-gallons-per day (MGD) Advanced Wastewater Treatment Plant with peak flows up to 120 MGD that runs 24 hours a day, 7 days a week. With multiple other construction work taking place at the NMCWRF, all work will have to be completed in phases to maintain the NMCWRFâs continuous operational needs.
Documents
No documents posted for this opportunity.
Contacts
Similar contracts
- GEORGE MASON REGIONAL LIBRARY RENOVATIONVADue Sep 2, 2026
- RFI - Solid Waste innovative ideasVADue Oct 30, 2026
- IFB 2000004390, Destruction of Public RecordsVADue Sep 14, 2026
- RFP 2000004243 Sewer RehabilitationVADue Sep 4, 2026
- IFB 2000004402, New Tires, Tubes, & ServicesVADue Aug 28, 2026
- REPLACEMENT OF (1) DRESSER ROOTS BLOWER VADue Aug 21, 2026