Pre-Qualification for Maintenance Shop Renovations at Noman M. Cole JR. Water Recycling Facility
- Response deadline
- Sep 10, 2026 Closed
- Date posted
- Aug 26, 2026
- Source
- Open notice
Description
The work shall include but may not be limited to the following: ⢠Demolition of interior finishes, shop equipment, doors, partitions, etc. at Building 'A', Building 'A2', and Building 'T'.⢠Providing new partitions, doors, finishes, etc. at Building 'A', Building 'A2', and Building 'T' where indicated.⢠Providing new shop equipment and relocating existing shop equipment.⢠Providing replacement of existing HVAC system, vents, ductwork, and other mechanical equipment.⢠Providing new plumbing fixtures, piping, and connections.⢠Providing new electrical outlets and light fixtures. ⢠Performing work in separate construction phases, as required for renovation of Owner-occupied spaces within areas of work.The work will take place within the NMCWRF, a 67 million-gallons-per day (MGD) Advanced Wastewater Treatment Plant with peak flows up to 120 MGD that runs 24 hours a day, 7 days a week. With multiple other construction work taking place at the NMCWRF, all work will have to be completed in phases to maintain the NMCWRFâs continuous operational needs.
Documents
No documents posted for this opportunity.
Contacts
Similar contracts
- Stratton Hats and AccessoriesVADue Sep 29, 2026
- Invitation to Apply for Pre-Qualification for Dead Run at Georgetown PikeVADue Oct 23, 2026
- Construction Support and Independent Quality Assurance, Verification, Sampling And Testing Services (IQAVS&T)VADue Oct 8, 2026
- IFB 2000004412 - Chemicals & Sand for Ice & Snow RemovalVADue Oct 8, 2026
- RFP 2000004365 Consulting ServicesVADue Sep 18, 2026
- RFP 2000004251VADue Oct 8, 2026