SAM.gov1240LT26Q0106
Open
GAOA Kents Lk. CG Reconstruction, Fishlake NF, Utah
AGRICULTURE, DEPARTMENT OF · Utah
- Response deadline
- Sep 23, 2026 Closed
- Date posted
- Aug 12, 2026
- Source
- Open notice
Description
The Kent’s Lake Campground Reconstruction Project, part of the Great American Outdoors Act (GAOA) program, will restore the campground’s natural environment while updating facilities to support increasing recreational use and modern vehicle requirements. The work includes demolition of existing structures, installation of new concrete features, upgraded family and tent campsites, improved water and sewer infrastructure, roadway and drainage enhancements, rock and retaining wall construction, fencing and gates, new signage, and site restoration including grading, surfacing, and seeding. The project aims to enhance visitor safety, accessibility, and resource protection while preserving the forest’s natural character.
Classifications
Documents (7)
- DownloadC04f Attachment 6 Kents Lake Site Visit Exhibit 1240LT26Q0106.docx.docx3.4 MB
- DownloadC04b Attachment 2 Specifications Kents Lake 1240LT26Q0106.docx.docx288 KB
- DownloadC04g Attachment 7 FIRE PLAN 1240LT26Q0106.docx.docx14 KB
- DownloadC04e Attachment 5 General Decision UT20260102 05182026.pdf.pdf1.5 MB
- DownloadC04 SF1442 1240LT26Q0106.pdf.pdf340 KB
- DownloadC04d Attachment 4 RFI Form 1240LT26Q0106.docx.docx29 KB
- DownloadC04c Attachment 3 Drawings Kents Lake 1240LT26Q0106.pdf.pdf23.1 MB
Contacts
Similar contracts
- GAOA Cordova Outhouse Replacement Chugach NFAlaskaDue Oct 6, 2026
- Pointe Mouillee Confined Disposal Facility Cells 1 and 2 Fill ManagementDue Oct 20, 2026
- Unit Price Contract for Maintenance Dredging of Pensacola Harbor Entrance ChannelDue Oct 13, 2026
- FY27 CCSC Entrance Channel Maintenance DredgingTexasDue Oct 9, 2026
- NAICS 237990 PSC Y1PZ--CONS: 909CM3030 Fort Custer NC - Cemetery Expansion and Site ImprovementsMichiganDue Oct 2, 2026
- Addendum 04 Advance Measures Mendenhall Glacier Juneau, AlaskaAlaskaDue Oct 15, 2026