SAM.govW9127826BA003
Open
Unit Price Contract for Maintenance Dredging of Pensacola Harbor Entrance Channel
- Response deadline
- Oct 13, 2026 Closed
- Date posted
- Sep 29, 2026
- Source
- Open notice
Description
The requirement will be for hydraulic cutterhead pipeline dredges, trailing suction hopper dredges, and/or mechanical dredges with scows. Dredges must be capable of dredging to a depth of 39 feet and be complete with crew, management staff and support equipment including tugs and various other floating plants as would normally be expected to support a large dredging operation. The material type expected for this requirement will be maintenance material typical for Pensacola Entrance Channel composed of sand. Material dredged will be placed west of the Pensacola Entrance Channel along Perdido Key Beach. The maximum pumping distance for beach placement will be approximately 30,000-feet. Amendment 0001 is posted 29 September 2026.
Classifications
Documents (1)
- attachmentNot yet available
Contacts
Similar contracts
- FY27 Euclid Creek Fishway ConstructionDue Dec 3, 2026
- Maintenance Dredging of the Isle au Haut Thoroughfare near Isle au Haut, MaineDue Nov 10, 2026
- Y--JELA 325250 335621 - Rehabilitate CemeteryDue Dec 10, 2026
- Borough of Millvale, Pennsylvania, Local Protection Project (LPP) PL84-99 RehabilitationDue Dec 8, 2026
- Tampa Harbor Improvements Industry DayFloridaDue Nov 18, 2026
- St. Lucie South Jetty Repair Industry DayFloridaDue Dec 7, 2026