Unit Price Contract for Maintenance Dredging of Pensacola Harbor Entrance Channel
- Response deadline
- Oct 13, 2026 Due in 7 days
- Date posted
- Oct 6, 2026
- Source
- Open notice
Description
The requirement will be for hydraulic cutterhead pipeline dredges, trailing suction hopper dredges, and/or mechanical dredges with scows. Dredges must be capable of dredging to a depth of 39 feet and be complete with crew, management staff and support equipment including tugs and various other floating plants as would normally be expected to support a large dredging operation. The material type expected for this requirement will be maintenance material typical for Pensacola Entrance Channel composed of sand. Material dredged will be placed west of the Pensacola Entrance Channel along Perdido Key Beach. The maximum pumping distance for beach placement will be approximately 30,000-feet. Amendment 0001 is posted 29 September 2026. Amendment 0002 is posted 05 October 2026. Amendment 0004 is posted 06 October 2026.
Classifications
Documents (1)
- attachmentNot yet available
Contacts
Similar contracts
- Maintenance Dredging of the Isle au Haut Thoroughfare near Isle au Haut, MaineDue Nov 5, 2026
- GIWW Freeport to Matagorda Maintenance DredgingDue Oct 19, 2026
- JP Murtha Float Mooring Bitts RetrofitDue Nov 5, 2026
- Upper Wicomico River Dredging Project, Wicomico County, MDDue Oct 21, 2026
- Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair, Haleiwa, Oahu, HawaiiDue Oct 15, 2026
- Design and Construction of Levee Access Manholes for Fairfax-Jersey Creek Levee Unit (Kansas City, Kansas)Due Oct 26, 2026