Upper Wicomico River Dredging Project, Wicomico County, MD
- Response deadline
- Oct 21, 2026 Due in 15 days
- Date posted
- Oct 6, 2026
- Source
- Open notice
Description
The U.S. Army Corps of Engineers (USACE), Baltimore District will be completing maintenance dredging in the upper half of the Wicomico River, Wicomico County, MD. Material will be placed at an existing upland placement site near the river named Sharps Point located in Salisbury, MD. The Magnitude of Construction is $4,000,000.00 to $8,000,000.00. The construction duration will be approximately 120 calendar days from Notice to Proceed.The scope includes using a hydraulic dredge and pipeline in the upper portion of the Wicomico River to remove material to its authorized depth of 14 feet. Approximately 250,000 cubic yards of material consisting of silts, sand, clays, mixed shell, gravel and other materials will be dredged and placed at the Sharps Point site. Minor construction of two weir boxes will also occur at the placement site prior to dredging operations.
Classifications
Documents (1)
- attachmentNot yet available
Contacts
Similar contracts
- Maintenance Dredging of the Isle au Haut Thoroughfare near Isle au Haut, MaineDue Nov 5, 2026
- GIWW Freeport to Matagorda Maintenance DredgingDue Oct 19, 2026
- Unit Price Contract for Maintenance Dredging of Pensacola Harbor Entrance ChannelDue Oct 13, 2026
- Design and Construction of Levee Access Manholes for Fairfax-Jersey Creek Levee Unit (Kansas City, Kansas)Due Oct 26, 2026
- Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair, Haleiwa, Oahu, HawaiiDue Oct 15, 2026
- JP Murtha Float Mooring Bitts RetrofitDue Nov 5, 2026