SAM.govW9127826BA003
Open
Unit Price Contract for Maintenance Dredging of Pensacola Harbor Entrance Channel
- Response deadline
- Aug 31, 2026 Closed
- Date posted
- Aug 14, 2026
- Source
- Open notice
Description
The requirement will be for hydraulic cutterhead pipeline dredges, trailing suction hopper dredges, and/or mechanical dredges with scows. Dredges must be capable of dredging to a depth of 39 feet and be complete with crew, management staff and support equipment including tugs and various other floating plants as would normally be expected to support a large dredging operation. The material type expected for this requirement will be maintenance material typical for Pensacola Entrance Channel composed of sand. Material dredged will be placed west of the Pensacola Entrance Channel along Perdido Key Beach. The maximum pumping distance for beach placement will be approximately 30,000-feet.
Classifications
Documents (1)
- attachmentNot yet available
Contacts
Similar contracts
- GAOA Cordova Outhouse Replacement Chugach NFAlaskaDue Oct 6, 2026
- Pointe Mouillee Confined Disposal Facility Cells 1 and 2 Fill ManagementDue Oct 20, 2026
- Unit Price Contract for Maintenance Dredging of Pensacola Harbor Entrance ChannelDue Oct 13, 2026
- FY27 CCSC Entrance Channel Maintenance DredgingTexasDue Oct 9, 2026
- NAICS 237990 PSC Y1PZ--CONS: 909CM3030 Fort Custer NC - Cemetery Expansion and Site ImprovementsMichiganDue Oct 2, 2026
- Addendum 04 Advance Measures Mendenhall Glacier Juneau, AlaskaAlaskaDue Oct 15, 2026