Cedar Creek Watershed 16 & 16A Remedial Repair -NRCS Texas
- Response deadline
- Aug 25, 2026 Due in 11 days
- Date posted
- Jul 23, 2026
- Source
- Open notice
Description
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. Solicitation number 12FPC326Q0043 is issued as a Request for Quotation (RFQ) for Cedar Creek Watershed 16 and 16A Remedial Repairs. The upstream wave berm repair for both Sites 16 and 16A will consist of stripping and stockpiling the topsoil from the embankment eroded area; performing excavation and earthfill activities to achieve the specified rock riprap subgrade; placing and anchoring geotextile fabric on the approved subgrade; placing rock riprap to the required thickness and limits as shown in the construction drawings; backfilling the toe of the rock riprap with earthen materials; blending the earthwork above the rock riprap into the existing embankment; establishing vegetation; and removing and reconstructing fence as shown on the construction drawings. The existing plunge basins for both sites have experienced erosion along the side slopes of the basin and outlet channel. To prevent/retard future erosion, the basins will be armored with a blanket of rock riprap. [Site 16A only] Plunge basin erosion has also caused damage to the principal spillway pipe in the vicinity of the pipe outlet. Repair of this damage includes excavating embankment material from around the damaged pipe sections; removing and reconstructing the damaged pipe cantilever, pipe support, and concrete cradle; replacing approximately 40 ft. of the damaged spillway pipe at the outlet; installing a new sand filter collar around a portion of the replaced pipe sections; and reconstructing the earthen embankment in this vicinity. This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 237990, Other Heavy and Civil Engineering Construction. The small business size standard is 45M. This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency. The contractor shall furnish all labor, materials, equipment and supervision required to construct the project at outlined in statement of work and detailed in the specifications, drawings, and plans attached hereto. Magnitude of Requirement: Between $1,000,000 and $5,000,000 Questions must be submitted in writing to Contract Specialist, Blake Boyer, at blake.boyer@usda.gov no later than August 13, 2026, 4PM Eastern Time. Please include the solicitation name and number as the subject line of the email. Please see the attached document(s) for complete details.
Classifications
Documents (10)
- C04_Att 2_Construction Specs Cedar Creek 16_.pdf.pdf1.3 MBNot yet available
- C04_Att 6_Drawing Cedar Creek 16_Seal Ready.pdf.pdf3.8 MBNot yet available
- C04_Att 1_SOW CedarCreek16_16A_Repairs.pdf.pdf213 KBNot yet available
- C04_Att 5_ Design Rpt Cedar Creek 16A_.pdf.pdf466 KBNot yet available
- C04_Att 3_Construction Specs Cedar Creek 16A_.pdf.pdf1.1 MBNot yet available
- C04_Att 7_Drawing Cedar Creek 16A_Seal Ready.pdf.pdf4.0 MBNot yet available
- C04_CSS_12FPC326Q0043_Watershed_NRCS TX_23Jul26.pdf.pdf318 KBNot yet available
- C04_Att 9_Schedule of Items_Cedar Creek.xlsx.xlsx14 KBNot yet available
- C04_Att 8_Wage Determination_TX20260020.pdf.pdf38 KBNot yet available
- C04_Att 4_ Design Rpt Cedar Creek 16.pdf.pdf527 KBNot yet available
Contacts
Similar contracts
- FY26 MOTSU BermsDue Aug 24, 2026
- TIMPAS PICNIC AREA SITE IMPROVEMENT PROJECTColoradoDue Aug 25, 2026
- Q4 FY26 Baltimore Harbor and Channels Maintenance Dredging, Maryland Channels, Chesapeake Bay, MDDue Sep 1, 2026
- RICHMOND INNER HARBOR FY26 MAINTENANCE DREDGING PROJECT Due Aug 28, 2026
- Calcasieu River and Pass, LA, Dredged Material Management Plan (DMMP), CDF-12A Degrading, Calcasieu Parish, LALouisianaDue Aug 21, 2026
- Thomas J. O Brien (TJO) Embankment RepairDue Sep 14, 2026